What you need
- Allen key
- Scissors
- Pliers
- Flat screwdriver
- Phillips screwdriver
- Use a flat screwdriver to push the metal prongs on the top of the crate upward.
- Use pliers to straighten the prongs upward.
- Lift the lid upward to open the crate.
- Push the lower prongs downward in reverse to release them.
- Repeat the same process for the side prongs.
- Pull the crate walls off one by one.
- Use a screwdriver to remove the screws on both sides of the crate.
- Remove the two horizontal support bars.
- Remove the plastic covers and set them aside for future use as dust covers.
- Remove all boxes and loose parts surrounding the machine.
- Use an Allen wrench to remove the bolts securing the machine to the pallet.
- Prepare a minimum of four people to assist with moving the machine.
- Carefully slide the machine off the pallet.
- Gently set the machine down on the floor.
- Remove all external plastic shrink wrap.
What you need
- Take-up system
- Take-up brackets
- Take-up bars
- Cooling fan for media cooling
Installing Take-Up Brackets
- Remove shrink wrap from the take-up brackets.
- Locate the bag containing bolts and Allen key.
- Identify left and right brackets using the notch orientation.
- Attach the brackets to the machine using the provided bolts.
- Do not fully tighten the bolts at this time.
- Remove shrink wrap from the cooling fan.
- Locate the two cooling fan brackets inside the packaging.
- Install the brackets using the same bolts.
- Ensure correct orientation and pull brackets fully outward before securing.
- Remove the pre-installed bolts from the cooling fan by hand.
- Position the cooling fan as shown in the video.
- Reinstall the two closest bolts without fully tightening.
- Install the remaining bolts.
- Once positioned correctly, tighten all bolts by hand.
- Install the power cable by turning it clockwise to tighten.
- Loosen the bolts on top of the take-up brackets using an Allen wrench.
- Install the first take-up bar and lightly tighten bolts by hand.
- Thread the second take-up bar through the take-up system.
- Loosen bolts as needed to pass the bar through the holes.
- Position the full take-up system onto the brackets.
- Thread the bar through both brackets.
- Connect the opposite side of the take-up system to the second bar.
- Tighten bolts by hand to secure the bars.
- Spread out the take-up system evenly.
- Install the take-up core into place.
- Tighten the core bolts by hand.
- Route the power cable on the right side as shown.
- Center all components.
- Fully tighten all bolts using the Allen key.
- Locate the vacuum cleaner and accessories.
- Plug in the vacuum to allow it to charge.
- Identify the tray at the bottom used to catch excess powder.
- Remove remaining shrink wrap from the machine exterior.
- Unlock all four latches.
- Lift the heating elements.
- Remove all internal shrink wrap and foam.
- Lower the lid halfway and manually release the safety slot.
- Close the lid fully and lock all latches.
- Remove protective film from the take-up reel.
- Remove protective film from the top cover.
- Lift the front heating plate.
- Use the support beam to hold the plate open.
- Leave the ground wire as is, or attach it to the heating plate if static issues occur.
- Plug the power cable into an outlet.
- Verify power requirements: 220V, 5.2 kW, 24 amps.
- If required, hardwire the machine according to local standards.
- Loosen the two bolts on the main breaker panel.
- Open the breaker lid.
- Turn the breaker on.
- Close the lid and secure it.
- Power on the shaker.
- Verify that all systems power on correctly.
What you need
- Machine powers on successfully
- No error indicators present
- All components installed securely