Miro 36 Powder Shaker Oven - Unpacking and Assembly Guide

  1. 0:00Tools, Safety, and Unpacking Overview
  2. 0:35Removing Crate Panels and Dust Cover
  3. 1:19Removing the Machine from the Pallet
  4. 2:10Preparing the Ramp and Adjusting Feet
  5. 2:55Sliding the Machine Down the Ramp
  6. 3:38Connecting the Dryer and Shaker Units
  7. 4:22Unpacking Cabinet Accessories
  8. 5:00Installing the Tension Bar Brackets
  9. 6:07Installing the Cooling System
  10. 6:48Installing the Takeup Reel
  11. 8:18Power Verification and Final Checks
  12. 8:54Electrical Configuration Notes
  13. 9:31Next Steps
Written steps13

Tools, Safety, and Unpacking Overview

Watch this part0:00

What you need

  • At least two people required
  • Electric screwdriver
  • Adjustable wrench
  • Gloves
  • Reusable shipping crate and dust cover (do not discard)

Removing Crate Panels and Dust Cover

Watch this part0:35
  1. Unlock all latches on the sides of the crate.
  2. With two people, lift the top panel straight up and set it aside.
  3. Unlock and remove all four side panels.
  4. Set all panels aside carefully to avoid injury.
  5. Remove the plastic dust cover from the machine.
  6. Set the dust cover aside for future use.
  7. Remove the instruction manual and materials from the top of the machine.

Removing the Machine from the Pallet

Watch this part1:19
  1. Use a power drill to remove the four support brackets securing the machine legs to the pallet.
  2. Remove the foam-wrapped wooden 2x4 from underneath the machine and discard it.
  3. Remove the second wooden 2x4 from underneath the machine.

Preparing the Ramp and Adjusting Feet

Watch this part2:10
  1. Unwrap one of the removed 2x4s.
  2. Lay the 2x4 near the pallet.
  3. Use one crate panel to create a ramp as shown in the video.
  4. Use an adjustable wrench to raise the machine feet.
  5. Tighten the upper nuts against the base before adjusting the foot pads.
  6. Repeat this process for all eight feet.

Sliding the Machine Down the Ramp

Watch this part2:55
  1. Do not push the machine directly.
  2. Carefully lower one side of the machine down the ramp while keeping the other side stationary.
  3. Allow the machine to descend at a controlled angle.
  4. For the dryer section, hold the top handle with one hand and the paper feed opening with the other.
  5. Slowly lower the dryer down the ramp.
  6. Ensure doorway clearance of at least 0.8 meters when moving the unit.

Connecting the Dryer and Shaker Units

Watch this part3:38
  1. Push the dryer and shaker units together.
  2. Remove the protective film from the dryer power port.
  3. Pull out the power cord.
  4. Plug the cord into the shaker power port and tighten the connector.
  5. Repeat this process for the remaining two cables.
  6. Feed excess cable inside as the units are brought together.
  7. Rotate the dryer feet clockwise to secure them.
  8. Level both units so their heights match.
  9. Loosen the four connecting knobs counterclockwise.
  10. Join the units together.
  11. Tighten the same four knobs clockwise to secure.

Unpacking Cabinet Accessories

Watch this part4:22
  1. Open the left cabinet door.
  2. Remove the protective foam.
  3. Remove the paper core.
  4. Remove the roll of film.
  5. Remove the foam box containing the filter.
  6. Lay out all accessories and verify nothing is missing.

Installing the Tension Bar Brackets

Watch this part5:00
  1. Locate the bag labeled number 2.
  2. Identify the two thin bars.
  3. Secure the first bracket to the back of the dryer using two screws.
  4. Remove the bearing and screws from one end of the bar.
  5. Insert the bar into the bracket.
  6. Reinstall the bearing and tighten the screws.
  7. Repeat for the opposite side of the bar.
  8. Repeat the entire process for the second bar.

Installing the Cooling System

Watch this part6:07
  1. Locate the bag labeled number 10.
  2. Position the cooling fan brackets on each side as shown.
  3. Verify correct bracket orientation.
  4. Secure each bracket using two thumb screws.
  5. Remove the two thumb screws from the cooling fan.
  6. Position the fan so the power cable is on the right side near the power port.
  7. Mount the fan to the brackets and secure using the thumb screws.
  8. Adjust fan direction by tightening or loosening the adjustment knob.
  9. Plug in the fan power cable and rotate clockwise to secure.

Installing the Takeup Reel

Watch this part6:48
  1. Gather the two poles and the two brackets labeled number 1.
  2. Secure each bracket using two thumb screws on the face and two on the side.
  3. Repeat on the opposite bracket.
  4. Loosen all eight thumb screws.
  5. Route the first pole through the rear hole.
  6. Tighten the four thumb screws evenly: Tighten the two top screws first
  7. Route the second pole through the right-side bracket only.
  8. Route the pole through the two parts labeled number 3.
  9. Ensure the motorized side is on the right and both parts face each other.
  10. Tighten the thumb screws to secure.
  11. Separate the takeup reel components.
  12. Insert the paper core.
  13. Align the paper core with the heating element above.
  14. Tighten the thumb screws to secure the core.
  15. Plug in the takeup reel power cable and rotate clockwise to lock.
  • Then tighten the two bottom screws

Power Verification and Final Checks

Watch this part8:18
  1. Plug in the main power cable.
  2. Turn the machine on.
  3. Confirm the control panel powers on and operates correctly.
  4. When opening the control panel, press only on the designated lower areas.
  5. Do not press directly on the screen.
  6. Turn off the machine after verification.

Electrical Configuration Notes

Watch this part8:54

What you need

  • 110V model:
  • Two power ports
  • Upper port: 18A (main heating element and takeup reel)
  • Lower port: 8A (preheating plate and powder shaking)
  • 220V model:
  • One power port
  • Draws 10A total
  • 110V model is specific to regions with 110V power

What you need

  • Refer to the Quick Start Guide to locate the operation video
  • Do not operate the machine until the operation video has been reviewed

Stuck on a step?

Our US tech team answers on Discord, and it is the fastest route to a person who knows this machine.

Get support